AERLAB
New job
DashboardClientsServiceEquipmentInvoicesSettings
Synced 5 h ago · Demo
AERLAB
  • Dashboard
  • Clients
  • Service
  • Equipment
  • Invoices
  1. Clients
  2. Capital Infrastructure Survey

Capital Infrastructure Survey

Olivia Brennan·+64 4 499 7120·Wellington

New job
Owed
$22,957
2 overdue
Open jobs
2
1 urgent
Equipment
5
2 in workshop
Lifetime
$62,226
2 won deals

Today

  1. AL-0029 → In progress

    12:25 pm

    Battery cell imbalance diagnostic

Sunday 4 October

  1. AL-0029 opened: Battery cell imbalance diagnostic

    4:25 pm

    Cell voltage deviation warning after storage.

Friday 2 October

  1. AL-0022 completed

    9:19 am

    Flat-field corrected and radiometric accuracy verified within ±2 °C.

30 Sept 2026

  1. AL-0022 → In progress

    2:41 pm

    Assigned to Aroha Ngata

29 Sept 2026

  1. AL-0022 opened: Thermal camera radiometric check

    11:11 am

    Thermal readings drifting compared to reference blackbody.

28 Sept 2026

  1. AL-0020 → In progress

    9:13 am

    Assigned to Sam Whitfield

27 Sept 2026

  1. AL-0020 opened: Thermal camera radiometric check

    1:25 pm

    Thermal readings drifting compared to reference blackbody.

  2. AL-0017 completed

    11:28 am

    Payload IMU and lever-arm recalibrated. Test block shows <3 cm layering.

24 Sept 2026

  1. AL-0017 → In progress

    12:17 pm

    Assigned to Sam Whitfield

23 Sept 2026

  1. AL-0017 opened: Payload IMU recalibration

    9:26 am

    Point cloud layering between flight lines.

Details

Address
Level 4, 86 Victoria StreetWellington
Email
olivia.brennan@capitalinfra.co.nz
Website
capitalinfra.co.nz
Tags
inspection, infrastructure, enterprise
Client since
15 Dec 2025
Xero
b219820…000de30Demo

Contacts2

  • Olivia Brennan· Survey Manager· primary
  • Raj Patel· Senior Pilot

Account notes