Capital Infrastructure SurveyOpened 22 SeptDone 26 Sept
Point cloud layering between flight lines.
No photos yet.
AL-0017 completed
26 Sept 2026Payload IMU and lever-arm recalibrated. Test block shows <3 cm layering.
AL-0017 → In progress
23 Sept 2026Assigned to Sam Whitfield
AL-0017 opened: Payload IMU recalibration
22 Sept 2026Point cloud layering between flight lines.