Capital Infrastructure SurveyOpened 28 SeptDone 1 Oct
Thermal readings drifting compared to reference blackbody.
No photos yet.
AL-0022 completed
5 d agoFlat-field corrected and radiometric accuracy verified within ±2 °C.
AL-0022 → In progress
29 Sept 2026Assigned to Aroha Ngata
AL-0022 opened: Thermal camera radiometric check
28 Sept 2026Thermal readings drifting compared to reference blackbody.