Capital Infrastructure SurveyOpened 10 JunDone 15 Jun
Thermal readings drifting compared to reference blackbody.
No photos yet.
AL-0009 invoiced
16 Jun 2026AL-0009 completed
15 Jun 2026Flat-field corrected and radiometric accuracy verified within ±2 °C.
AL-0009 → In progress
11 Jun 2026Assigned to Aroha Ngata
AL-0009 opened: Thermal camera radiometric check
10 Jun 2026Thermal readings drifting compared to reference blackbody.