AERLAB
New job
DashboardClientsServiceEquipmentInvoicesSettings
Synced 5 h ago · Demo
AERLAB
  • Dashboard
  • Clients
  • Service
  • Equipment
  • Invoices
  1. Service
  2. AL-0011

Dock cover motor fault

Taranaki Energy Inspections Ltd·Opened 1 Aug·Done 3 Aug

View invoice
DJI Dock 2
7CTDLBCPZT1KLR
Total
$1,365.63
Taranaki Energy Inspections Ltd+64 6 758 3304
  1. Create the invoice first

Job details

Dock cover failing to close fully — mission aborts.

Photos

No photos yet.

Labour & parts

Invoiced — locked
ItemHours / qtyRateTotal
Labour
$
Labour total$507.50
$
$680.00
Subtotal
$1,187.50
GST 15%
$178.13
Total incl. GST
$1,365.63

Activity

  1. AL-0011 invoiced

    7 Aug 2026
  2. AL-0011 completed

    3 Aug 2026

    Drive motor current spiking; replaced and limit switches re-set.

  3. AL-0011 → In progress

    2 Aug 2026

    Assigned to Liam Chen

  4. AL-0011 opened: Dock cover motor fault

    1 Aug 2026

    Dock cover failing to close fully — mission aborts.

Equipment

DJI Dock 2
Dock
7CTDLBCPZT1KLR

1 job · last in 3 Aug · warranty to 8 Jul 2028

Firmware v10.01.1612

Client

Taranaki Energy Inspections Ltd

Craig Donovan

craig.donovan@taranakienergy.co.nz+64 6 758 3304

Invoice

INV-2079Paid
Due 24 Aug 2026Owing $0.00