Bay of Plenty Kiwifruit Drone CoOpened 26 AugDone 30 Aug
Application rate reading high and dripping at the left boom.
No photos yet.
AL-0012 invoiced
1 Sept 2026AL-0012 completed
30 Aug 2026Split delivery hose replaced, flow meter recalibrated against measured output.
AL-0012 → In progress
27 Aug 2026Assigned to Sam Whitfield
AL-0012 opened: Flow meter calibration & leak
26 Aug 2026Application rate reading high and dripping at the left boom.