Taranaki Energy Inspections LtdOpened 8 FebDone 13 Feb
RTK stuck on FLOAT with network RTK and D-RTK 2.
No photos yet.
AL-0005 invoiced
14 Feb 2026AL-0005 completed
13 Feb 2026Damaged RTK antenna connector. Module replaced; FIX achieved within 40 s on NZ CORSnet.
AL-0005 → In progress
9 Feb 2026Assigned to Sam Whitfield
AL-0005 opened: RTK module not achieving FIX
8 Feb 2026RTK stuck on FLOAT with network RTK and D-RTK 2.