AERLAB
New job
DashboardClientsServiceEquipmentInvoicesSettings
Synced 5 h ago · Demo
AERLAB
  • Dashboard
  • Clients
  • Service
  • Equipment
  • Invoices
  1. Service
  2. AL-0005

RTK module not achieving FIX

Taranaki Energy Inspections Ltd·Opened 8 Feb·Done 13 Feb

View invoice
DJI Matrice 30T
1YYDKKA239U0VS
Total
$954.50
Taranaki Energy Inspections Ltd+64 6 758 3304
  1. Create the invoice first

Job details

RTK stuck on FLOAT with network RTK and D-RTK 2.

Photos

No photos yet.

Labour & parts

Invoiced — locked
ItemHours / qtyRateTotal
Labour
$
Labour total$290.00
$
$540.00
Subtotal
$830.00
GST 15%
$124.50
Total incl. GST
$954.50

Activity

  1. AL-0005 invoiced

    14 Feb 2026
  2. AL-0005 completed

    13 Feb 2026

    Damaged RTK antenna connector. Module replaced; FIX achieved within 40 s on NZ CORSnet.

  3. AL-0005 → In progress

    9 Feb 2026

    Assigned to Sam Whitfield

  4. AL-0005 opened: RTK module not achieving FIX

    8 Feb 2026

    RTK stuck on FLOAT with network RTK and D-RTK 2.

Equipment

DJI Matrice 30T
Aircraft
1YYDKKA239U0VS

2 jobs · last in 13 Mar · warranty to 21 Sept 2026

Firmware v10.01.0812

Client

Taranaki Energy Inspections Ltd

Craig Donovan

craig.donovan@taranakienergy.co.nz+64 6 758 3304

Invoice

INV-2059Paid
Due 6 Mar 2026Owing $0.00